<?xml version="1.0" encoding="ISO-8859-1" ?> 
<rss version="2.0">
<channel>
	<title>Cornell University Special Conditions</title>
	<link>http://www.cornell.edu/cuinfo/specialconditions</link>
    <description>Special Conditions Website</description>
    <language>en-us</language>
   
    <lastBuildDate>Sun, 10 Jul 2011 0:15:01 EST</lastBuildDate>

    <item>
    <title><![CDATA[Triphammer Mall detours for TCAT bus routes 32 and 72]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#981</link>
	<description><![CDATA[Due to a construction project at Triphammer Mall, TCAT bus routes 32 and 72 will be detoured effective Monday, July 11 through Saturday, August 20.
 
Outbound buses will turn right from Triphammer Road onto Sheraton Drive; left onto Cinema Drive; then right onto Uptown Road and back onto the normal route. Inbound buses will turn left from Uptown Road onto Cinema Drive; then right onto Sheraton Drive; then left onto Triphammer Road and back onto the normal route.
 
Passengers who wish to access Triphammer Mall (traveling outbound) can choose one of three options:  routes 32 or 72 to Sheraton Drive at Triphammer Road, to access the west side of the mall; routes 32 or 72 to Cinema Drive at Uptown Road, to access the east side of the mall; or take routes 30 or 70 to the stop at Triphammer at Tompkins Trust Co.  
 
Passengers coming from Triphammer Mall (traveling inbound) can access the bus at the following three locations: routes 32 or 72, Cinema Drive at Uptown Road; routes 32 or 72, Sheraton Drive at Triphammer Road; or routes 30 or 70 at Triphammer Road at Lansing West Apartments.
 
The detour will not impact departure/arrival times as shown on schedules.]]></description>
    <pubDate>Fri, 08 Jul 2011 16:05:55 -0500</pubDate>
    <expDate>Sat, 20 Aug 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[TCAT bus stop at Seneca at Commons to be relocated July 11 through 13 ]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#979</link>
	<description><![CDATA[Due to a utility construction project at the 200 block of East Seneca Street, the Seneca Street bus shelter (Seneca at Commons stop) will be relocated starting Monday, July 11, tentatively through Wednesday, July 13, 2011.
 
Route 10 buses will stop just around the corner on North Tioga Street, immediately north of the intersection with Seneca Street. All other routes will stop on the 100 block of East Seneca Street in front of Starbucks and the Hilton Garden Inn.
 
Signage will be posted to guide passengers to the appropriate waiting areas.]]></description>
    <pubDate>Fri, 08 Jul 2011 16:02:19 -0500</pubDate>
    <expDate>Fri, 15 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Bruckner N permit parking lot east of Rice Hall closed  July 11 through July 15]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#977</link>
	<description><![CDATA[The Bruckner N permit parking lot east of Rice Hall will be closed Monday, July 11 through Friday, July 15, 2011 for pavement repairs and maintenance.  During this closure N permit holders can park in the Tower Road or Alumni Field N parking lots.]]></description>
    <pubDate>Thu, 07 Jul 2011 15:42:59 -0500</pubDate>
    <expDate>Fri, 15 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Intersection of Garden Avenue and Tower Road will be four-way stop July 11 through 15]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#975</link>
	<description><![CDATA[The traffic light signals at the intersection of Garden Avenue and Tower Road will be turned off Monday, July 11 through Friday, July 15, 2011 to replace light poles and stop light assemblies.  Four-way stop signs will be installed to control traffic.]]></description>
    <pubDate>Thu, 07 Jul 2011 15:41:54 -0500</pubDate>
    <expDate>Fri, 15 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Drive east of Ken Post Lab closed July 11 through July 31]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#972</link>
	<description><![CDATA[The drive on the east side of Ken Post Lab will be closed Monday, July 11 through Sunday, July 31, 2011 to complete the basement infill and paving-over of the headhouse.  Emergency vehicle access will be maintained up to the work site.  The drive on the west side of Ken Post Lab will be opened for two-way daily access to the Floriculture Greenhouse buildings and emergency vehicles. Signs will be posted regarding the road closure and the two-way traffic notification.]]></description>
    <pubDate>Thu, 07 Jul 2011 12:11:51 -0500</pubDate>
    <expDate>Sun, 31 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Section of Tower Road reduced to one-lane traffic July 11 - 15  ]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#967</link>
	<description><![CDATA[A section of Tower Road in front of Uris Hall will be reduced to one lane of traffic Monday, July 11 through Friday, July 15, 2011, during the hours of 6 a.m. and 2 p.m., to complete work on chilled water lines. Flagmen will assist with traffic flow during the lane closure.]]></description>
    <pubDate>Tue, 05 Jul 2011 13:37:28 -0500</pubDate>
    <expDate>Fri, 15 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Lincoln Hall access drive & sidewalk south of Rand Hall closure July 5-29]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#961</link>
	<description><![CDATA[The Lincoln Hall access drive and nearby sidewalk between the south entrance to Rand Hall and the southeast side of Sibley Hall will be closed Tuesday, July 5 - Friday, July 29, 2011 to complete work associated with the Milstein Hall project.

Lincoln Hall loading dock and parking spaces will remain open with access from Central Avenue between White and Tjaden Halls on the west side of the Arts Quad.  Signs will be posted.

Barricades and signs will be posted to direct foot traffic during the sidewalk closure.  The Arts Quad will remain accessible by a marked detour between Lincoln and Goldwin Smith Halls on East Avenue.]]></description>
    <pubDate>Thu, 30 Jun 2011 14:15:16 -0500</pubDate>
    <expDate>Fri, 29 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Tower Road  - Possible Traffic Disruption July 1-29]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#959</link>
	<description><![CDATA[Grounds Department will be trimming trees along Tower Road between Garden Avenue and Campus Road which may cause some traffic disruptions Friday, July 1, 2011  Friday, July 29, 2011.  Flagmen will be positioned to assist with traffic.]]></description>
    <pubDate>Thu, 30 Jun 2011 13:01:47 -0500</pubDate>
    <expDate>Fri, 29 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Sidewalk closure on Campus Road in front of Small Companion Hospital, June 20 - August 8]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#951</link>
	<description><![CDATA[A section of sidewalk on Campus Road in front of the Small Companion Hospital will be closed Monday, June 20, 2011 through Monday, August 8, 2011 for structural repair of the steam vault.  When necessary, the west drive into the Small Companion Hospital parking lot will be closed during working hours.  

Barricades and signs will be in place to redirect pedestrians around the closed section of sidewalk.

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns.]]></description>
    <pubDate>Wed, 15 Jun 2011 09:00:00 -0500</pubDate>
    <expDate>Mon, 08 Aug 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Sidewalk closure on Campus Road by Bartel's Hall, June 20 - August 8]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#949</link>
	<description><![CDATA[A section of sidewalk on the east end of Campus Road in front of Bartel's Hall will be closed Monday, June 20, 2011 through Monday, August 8, 2011 for structural repair of the steam vault. 

A temporary walk will be installed to accommodate pedestrians around the closed section of sidewalk.

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns.]]></description>
    <pubDate>Wed, 15 Jun 2011 08:56:38 -0500</pubDate>
    <expDate>Mon, 08 Aug 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Sacketts pedestrian Bridge over east end of Beebe Lake Closed  June 13 through August 12]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#946</link>
	<description><![CDATA[The Sacketts pedestrian bridge over east end of Beebe Lake will be closed from Monday, June 13 through Friday, August 12, 2011 to perform structural repairs to the concrete arch and replace the stone work and foot path. The bridge will reopen by 5:00 PM Friday, August 12, 2011.

Detour signs will be in place directing pedestrian traffic to the Thurston Avenue bridge. 

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns.
]]></description>
    <pubDate>Fri, 10 Jun 2011 16:40:15 -0500</pubDate>
    <expDate>Fri, 12 Aug 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Arts Quad Sidewalk Closure - June 2 through Nov. 30, 2011]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#938</link>
	<description><![CDATA[A section of walkway on the Arts Quad in front of McGraw Hall will be closed June 2 through November 30, 2011 for the McGraw Hall roofing and stabilization project.

Barricades and signs will be in place to redirect pedestrians around the closed section of sidewalk.

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns. ]]></description>
    <pubDate>Thu, 02 Jun 2011 08:36:32 -0500</pubDate>
    <expDate>Wed, 30 Nov 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Fall Creek Suspension Bridge Closed  June 13 through July 15]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#936</link>
	<description><![CDATA[The suspension bridge over Fall Creek will be closed beginning 6:00 AM Monday, June 13, 2011 through Friday, July 15, 2011 to complete structural repairs. The bridge will reopen by 4:00 PM Friday, July 15, 2011.

Detour signs will be in place directing pedestrian traffic to the Thurston Avenue bridge for access to and from campus. 

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns. ]]></description>
    <pubDate>Wed, 01 Jun 2011 10:02:24 -0500</pubDate>
    <expDate>Fri, 15 Jul 2011 18:00:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Fernow Hall construction project to impact vehicular traffic and parking beginning May 31, 2011]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#923</link>
	<description><![CDATA[The Fernow Hall construction project will necessitate road closures and parking changes in the area as follows:

"Tuesday, May 31, 2011 - the drive west of Rice Hall will be closed between 7:00 AM - 1:00 PM. Access to parking will be from the drive east of Rice Hall. Flagmen will be posted to direct traffic as required.

"Wednesday, June 1, 2011 - the drive east of Rice Hall will be closed between 7:00 AM - 7:00 PM. Access to parking will be from the drive west of Rice Hall. Flagmen will be posted to direct traffic as required.

"Thursday, June 2, 2011 - the drive west of Rice Hall and the drive between Rice Hall and Little Rice will be closed for the duration of the Fernow Hall project. The drive east of Rice Hall will be the only access to parking during this time. The north end of the west drive, as well as the drive between Rice and Little Rice Halls will be available for deliveries. Both drives are slated to reopen on June 1, 2013, the expected completion date of this project.

"The following parking areas will be closed from June 1, 2011 through June 1, 2013:
oN parking area on the drive west of Rice Hall
oall N parking areas north and east of Fernow Hall
oFLEX parking area north of Bruckner Hall
oAccessible and loading spaces between Fernow and Emerson Halls

"The remaining spaces behind Fernow Hall will be reassigned for Accessible, Loading, and MT  parking.

We will relocate a FLEX parking area on Tower Road across from Rice Hall.

Please contact Facilities Services Customer Service at 255-5322 with questions or concerns. ]]></description>
    <pubDate>Wed, 25 May 2011 14:58:08 -0500</pubDate>
    <expDate>Sun, 02 Jun 2013 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Construction Update - East Seneca Street Water & Sewer project]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#903</link>
	<description><![CDATA[The City of Ithaca will be replacing water and sewer lines on the 300 and 400 blocks of East Seneca Street beginning Sunday, May 15 at 6:00 PM and continuing through Friday, August 5 at 3:30 PM. East Seneca Street between the intersection of North Aurora Street and Schuyler Place will be closed to through traffic for the duration of the project. 
 
During the first two weeks of the project, construction will be performed from 6:00 PM to 4:30 AM, Sunday through Thursday. During night work, westbound traffic on E. State/MLK Jr Street (Rt 79) will be reduced to one lane in the vicinity of the work zone. Also during the first two weeks of the project, the eastern pedestrian crosswalk across Seneca Street at North Aurora Street will be closed during working hours and re-opening Tuesday, May 31. 
 
Westbound traffic normally accessing East Seneca Street should utilize East Buffalo Street of East State/MLK Jr. Street via Stewart Avenue to access downtown Ithaca. 
 
For additional information, contact Erik Whitney, DPW Water & Sewer Division at 272-1717.
]]></description>
    <pubDate>Sat, 14 May 2011 11:30:01 -0500</pubDate>
    <expDate>Fri, 05 Aug 2011 4:00:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Ellis Hollow Road westbound lane closure begins Monday, May 9]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#885</link>
	<description><![CDATA[The Tompkins County Highway Division will be closing the westbound lane of Ellis Hollow Road, between Thomas Road and Turkey Hill Road, in the Town of Dryden, for completion of the road reconstruction and drainage project that began in August 2010, beginning at 6:00 a.m. on Monday, May 9, 2011, until approximately 4:30 p.m. on Friday, July 29, 2011.  The westbound lane will be closed to all traffic.
 
Please contact the Highway Division, at (607) 274-0300, with questions or concerns.
]]></description>
    <pubDate>Wed, 04 May 2011 13:51:00 -0500</pubDate>
    <expDate>Fri, 29 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[University Ave. Construction Detours as of April 14, 2011]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#867</link>
	<description><![CDATA[The stairs connecting the suspension bridge to University Avenue, the crosswalk on University Avenue, and the sidewalk on the west side of Tjaden Hall closed April 14 and will remain closed until work on University Avenue is substantially complete. 

The suspension bridge will remain open. 

Detour signs directing pedestrian traffic to and from campus will be posted directing use of either the Thurston Avenue bridge or the suspension bridge and trail around University Avenue to the sidewalk located on the Johnson Art Museum access drive. The work is being coordinated so that the re-opening of the new roadway will coincide with the completion of the Johnson Art Museum and Milstein Hall projects for the Fall 2011 semester.

The north sidewalk along University Avenue between 726 University Avenue, the Chi Psi fraternity, and the Foundry will remain closed for the duration of the project. Access to the Foundry will be from the East Avenue side only.

Please contact the Facilities Customer Service Center at 607-255-5322 with any question or concerns.]]></description>
    <pubDate>Thu, 14 Apr 2011 15:49:04 -0500</pubDate>
    <expDate>Thu, 01 Sep 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Columbia Street pedestrian bridge to close for rehabilitation work]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#838</link>
	<description><![CDATA[The City of Ithaca has announced that the Columbia Street pedestrian bridge rehabilitation project will begin Monday, March 25 and be completed at the end of July. The bridge will be closed to pedestrians and bicyclists for the duration of the project.]]></description>
    <pubDate>Thu, 17 Mar 2011 10:21:07 -0500</pubDate>
    <expDate>Sun, 31 Jul 2011 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	
    <item>
    <title><![CDATA[Stocking Hall construction will relocate bus stop beginning March 7th]]></title>
	<link>http://www.cornell.edu/cuinfo/specialconditions/#800</link>
	<description><![CDATA[The bus stop on the south side of Tower Road at Stocking Hall will be relocated to a temporary pad west of Wing Drive beginning Monday, March 7th to accommodate the Stocking Hall construction project. This new bus stop will remain in service for the duration of the project. Additionally, long-term site fencing will be installed east of Stocking Hall along Judd Falls Road and the southwest corner of the site between Wing Hall and Stocking Hall. ]]></description>
    <pubDate>Thu, 24 Feb 2011 14:14:40 -0500</pubDate>
    <expDate>Fri, 24 Feb 2012 23:59:00 -0500</expDate>
    <Priority>2</Priority>
    <alerttype>Non-emergency (Facilities / Transportation)</alerttype>
	</item>
	</channel></rss>

